Dominion Atlantic Railway Digital Preservation Initiative - Wiki

Use of this site is subject to our Terms & Conditions.

Difference between revisions of "Kentville Water Tower"

From DARwiki
(image)
Line 17: Line 17:
  
 
<gallery type="slideshow">
 
<gallery type="slideshow">
Image:Hebert.jpg|[[DAR0544|No. 544]] on the [[Kentville Turntable|turntable]], circa 1930. The [[Kentville Water Tower|water tower ]], on  the far right, occupies its first location, before it was moved & replaced with a stand pipe.
+
File:Kalkman51.jpg|The [[:Category:The Advertiser|Advertiser]] Jan. 28, 1965 photograph of Locomotive [[DAR0544|No. 544]] on the [[Kentville Turntable]] with [[Kentville Roundhouse|roundhouse]] and [[Kentville Machine Shop|machine shop]] workers plus the . The [[Kentville Water Tower]], circa 1930.
  
 
File:KE-00.00 Kentville Roundhouse.JPG|Detail from Kentville Track Schematic showing [[Kentville Roundhouse]], [[Kentville Machine Shop]] and [[Kentville Water Tower]], circa 1920.
 
File:KE-00.00 Kentville Roundhouse.JPG|Detail from Kentville Track Schematic showing [[Kentville Roundhouse]], [[Kentville Machine Shop]] and [[Kentville Water Tower]], circa 1920.

Revision as of 20:06, 11 July 2023

Kentville Water Tower

A series of water towers associated with the Kentville Terminal Shops supplied steam locomotives.

The First Water Tower

Early locomotives may have been supplied by an internal water tank in the original Windsor and Annapolis Kentville Roundhouse, but the first documented water tower was located south of the mainline and just east of the W&AR engine house and shops, close to Main Street. The 35,000 gallon tank supplied locomotives from a six-inch wide stand pipe located between the DAR mainline and one of the yard tracks north of the tank.[1] The tank had a square wooden base[2] and an ornamental finial at the top along with a numbered water gauge facing north.

The Second Water Tower

A standard CPR 10,000 gallon[3] semi-enclosed octagonal wooden water tower, it was located by the turntable fit and had two discharge pipes, one by the roundhouse lead and the other on the Kingsport branch line. A numbered water gauge was located on the tank side between the discharge pipes, facing east. A chimney pipe from the tank heater rose from the summit of the tank roof.


The Third Water Tower

A new water tower, also a standard CPR semi-enclosed octagonal design was built closer to the river about 1943. It was fed a water stand pipe located at the turntable lead by the turntable pit. A mast on the roof hoisted a ball up and down to indicate the water level in the tank. This tank served until the end of steam in the early 1960s.

References and Footnotes

External Links