Dominion Atlantic Railway Digital Preservation Initiative - Wiki
Use of this site is subject to our Terms & Conditions.
Halfway River Bridge
Halfway River Bridge
Mile 37.17 on the Halifax Subdivision
Located just east of Hantsport, the bridge crossed the Halfway River (so named because in early times it marked the halfway point between Grand Pre and Windsor) where it meets the larger Avon River.[1] The Halfway River is small, but it has a deep tidal estuary surrounded by wide tidal marshes where it is crossed by the DAR. This crossing required regular upgrades and repair throughout the history of the DAR.
The river was first bridged by the DAR in 1869 with a 1,800 foot trestle and a covered wooden truss bridge.[2] By 1873, an engineer's report indicated that the trestle was 640 feet long (32 trestle spans, each each 20 feet long) and the bridge was a 150-foot long wooden truss bridge. The report by engineer Alexander MacNab noted that the main span was weak and needed a pier in the middle and that many of the pile trestles were gradually being replaced by trestle bents.[3] The wooden bridge was replaced by a causeway with an aboiteau in 1879.[4] The aboiteau as rebuilt in 1914-1915.[5]
By 1969, most of the trestle approach had been filled and converted to an embankment leaving a 40-foot-long pile trestle over a spillway on the east side of a causeway crossing the Halfway River over an aboiteau with three 60-inch corrugated metal pipes.[6] DAR crews had to fill in a major washout at the Halfway River bridge in August 1971.[7]
The railway ceased to be used in 2011. The causeway slowly began to erode and the aboiteau gates ceased functioning. Erosion increased dramatically in September 2017 and a large washout occurred in the causeway, leaving the rails hanging in mid-air and exposing the pile trestle work of older versions of the bridge.[8] The Windsor and Hantsport Railway put up barricades and removed the hanging rails on February 7, 2018,[9] but the washout grew leading to extensive tidal flooding of the formerly protected Halfway River Valley which raised fears about erosion and flooding of roads and power lines. The flooding has led to a dispute between the Province of Nova Scotia and the Windsor and Hantsport Railway over who owns the aboiteau and who bears the responsibility for the washout.[10] After the site the site was documented by arachaeologists, the province rebuilt the aboiteau in the fall of 2019 and is suing the Windsor and Hantsport Railway for the cost.[11]
Gallery
Construction work at the Halfway River Bridge in Hantsport, with the town in the background, date unknown.
Flying Bluenose at Hantsport crossing the Halfway River Bridge, possibly with coach No. 27 and baggage car No. 46 circa 1920.
Track schematic for Hantsport, 1918s, including the gypsum loading spurs, the Minas Basin Pulp spurs, the Hantsport Railyard and the Halfway River Bridge and Aboiteau.
No. 8133 and ballast cars repairing washout at the Halfway River Bridge at Hantsport, CKF paper plant in background, August 1971.
Windsor and Hantsport leased locomotives CEMR 4012 4011 haul a gypsum train nearing across the Halfway River Bridge at Hantsport, August 17, 2007.
2017 Washout
Halfway River Bridge washout at Hantsport with DAR tracks hanging in midair over the eroding causeway over the former aboiteau, December 2017.
Halfway River Bridge washout at Hantsport with DAR tracks hanging over the former aboiteau and dyke remains, December 2017.
Halfway River Bridge washout at Hantsport, with collapsed aboiteau remnants of older bridge structure, April 28, 2018.
Halfway River Bridge looking west at Hantsport, close up of bridgework remains, Aug. 13, 2018
Halfway River Bridge washout at Hantsport and the bridge remains, August 13, 2018.
Halfway River Bridge at Hantsport, east side with wash out and piles from older bridges, with the CKF paper plant in background, Sept. 15, 2018.
2019 Archaeology
Archaeological drawing of the aboiteau and trestle remains in the washed out Halfway River Bridge at Hantsport, March 2019.
References
- ↑ C. Bruce Fergusson, "Hantsport", Place-Names and Places of Nova Scotia Nova Scotia Archives (1967), page 278.
- ↑ W.W. Clarke, Clarke's History of the Earliest Railways in Nova Scotia, page 38.
- ↑ Windsor and Annapolis Railway, Report of Alexander MacNab, C. E., November 1, 1873, page 7.
- ↑ Allen B. Robertson, Tide and Timber: Hantsport Nova Scotia 1795-1995, Lancelot Press, 1996, page 71
- ↑ Extensive Improvements on the Dominion Atlantic Railway.” CANADIAN RAILWAY AND MARINE WORLD, November 1914, 490.|Extensive Improvements on the Dominion Atlantic Railway.” CANADIAN RAILWAY AND MARINE WORLD, November 1914, p. 490.
- ↑ Memorandum of General Information on the Dominion Atlantic Railway, Feb. 17, 1969, page 4, Dominion Atlantic Railway, Library and Archives Canada HE2810 D7 D7 fol
- ↑ Bill Linley, Canadian Pacific in Color Volume 1: Eastern Lines, page 14.
- ↑ Carole Morris-Underhill, "Hantsport's Halfway River aboiteau failing, residents concerned about bridge integrity", Kings County Advertiser/Register, January 11, 2018.
- ↑ Carole Morris-Underhill, "Hantsport's failed aboiteau not only railway's problem to fix: owner, Kings County Advertiser/Register, February 9, 2018
- ↑ "LETTER: Railway owner weighs in on Hantsport aboiteau issue", The Register/Advertiser, Sept. 10, 2018
- ↑ Michael Gorman, "Upgrades to former Hantsport aboiteau about a month from completion", CBC News, Oct 29, 2019