Dominion Atlantic Railway Digital Preservation Initiative - Wiki

Use of this site is subject to our Terms & Conditions.

The Joggins Bridge

From DARwiki
Revision as of 03:18, 12 February 2020 by Stem (talk | contribs) (→‎History)

The Joggins Bridge

Mile 16.5 Yarmouth Subdivision

Structure

1969: 285 feet long, two deck plate girder spans and with timber trestle approaches.(1)

History

This was originally a long and challenging tidal bridge, one of the difficult and expensive bridges along with the Bear River Bridge and the Clementsport Bridge of the "missing link" which delayed the Digby-Annapolis connection for years. Over the years the bridge spans and pile trestle were progressively replaced by fill, eventually becoming a long embankment with a few short spans.

References

(1) Memorandum of General Information on the Dominion Atlantic Railway, Feb. 17, 1969, page 16, Dominion Atlantic Railway, Library and Archives Canada HE2810 D7 D7 fol., page 16.