Dominion Atlantic Railway Digital Preservation Initiative - Wiki

Use of this site is subject to our Terms & Conditions.

Difference between revisions of "Big Joggins Bridge"

From DARwiki
m
m
Line 11: Line 11:
  
 
<Gallery>
 
<Gallery>
 +
File:YA-16.50 Big Joggins.jpg|Track plan section showing the bridge.
 
File:1272jogginbridge.jpg|[[CPR1272|No. 1272]] on an eastbound freight at [[The Joggins Bridge]] in the winter of 1988.
 
File:1272jogginbridge.jpg|[[CPR1272|No. 1272]] on an eastbound freight at [[The Joggins Bridge]] in the winter of 1988.
 
File:Eb plow extra feb 1987.jpg|Eastbound snowplow extra at [[The Joggins Bridge]] in the winter of 1987. Locomotive is [[CPR1272|No. 1272]] and the snowplow is [[DAR401032|No. 401032]].
 
File:Eb plow extra feb 1987.jpg|Eastbound snowplow extra at [[The Joggins Bridge]] in the winter of 1987. Locomotive is [[CPR1272|No. 1272]] and the snowplow is [[DAR401032|No. 401032]].

Revision as of 07:55, 14 February 2020

The Big Joggins Bridge

Mile 16.5 Yarmouth Subdivision

Structure

1914: The old wooden trestle and wooden swing span have been replaced by a 120 ft. d.s. span; filled 785 ft. of the trestle approaches, renewing entirely the remaining 180 ft. of trestling. [1]
1969: 285 feet long, two deck plate girder spans and with timber trestle approaches.[2]

History

This was originally a long and challenging tidal bridge, one of the difficult and expensive bridges along with the Bear River Bridge and the Clementsport Bridge of the "missing link" which delayed the Digby-Annapolis connection for years. Over the years the bridge spans and pile trestle were progressively replaced by fill, eventually becoming a long embankment with a few short spans.

References