Dominion Atlantic Railway Digital Preservation Initiative - Wiki

Use of this site is subject to our Terms & Conditions.

Difference between revisions of "Middleton Railyard"

From DARwiki
Line 1: Line 1:
 
==[[Middleton]] Railyard==
 
==[[Middleton]] Railyard==
In 1873 it was reported that Middleton had a through siding of 420' feet and a blind siding of 260'.<ref>Windsor and Annapolis Railway, Report of Alexander MacNab, C. E., November 1, 1873. p22</ref>
+
In 1873 it was reported that Middleton had a through siding of 420' feet and a blind siding of 260'.<ref>Alexander MacNab, ''[[Windsor and Annapolis Railway, Report of Alexander MacNab 1873|Windsor and Annapolis Railway, Report of Alexander MacNab Nov 1, 1873]]'' p22</ref>
  
 
[[1969-MemoOfGenInfo]] lists the railyard as:
 
[[1969-MemoOfGenInfo]] lists the railyard as:

Revision as of 00:23, 16 January 2012

Middleton Railyard

In 1873 it was reported that Middleton had a through siding of 420' feet and a blind siding of 260'.[1]

1969-MemoOfGenInfo lists the railyard as:

  • Passing track 2239' long.
  • Stock pen.
  • Wye at this point
D.A.R. trackage in Middleton.

Gallery

References and Footnotes

External Links