Dominion Atlantic Railway Digital Preservation Initiative - Wiki

Use of this site is subject to our Terms & Conditions.

Difference between revisions of "Middleton Enginehouse"

From DARwiki
m
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
==Middleton Enginehouse September 1916 to 1927 <ref>Middleton 1909 -1984 Heart of the Valley pg. 26 </ref> ==
 
==Middleton Enginehouse September 1916 to 1927 <ref>Middleton 1909 -1984 Heart of the Valley pg. 26 </ref> ==
  
Middleton Enginehouse was located at the east end of the yard and was completed around 8th September 1916 and was demolished in 1927 only lasting for ten years.
+
An [[:Category:Roundhouses|enginehouse]] at [[Middleton]] was built at the east end of the [[Middleton Railyard]]. The 88-foot long wooden engine house could accommodate three locomotives. Construction began in August 1916 by the DAR's Bridge and Building department, led by foreman H. Dalton. The enginehouse was completed around September 8, 1916. It was demolished in 1927, only lasting for ten years.
  
 
<gallery>
 
<gallery>
File:TO - 19160908 - TheLocomotiveHouse.jpg | The Outlook article about the new Middleton Enginehouse
+
File:Weekly Monitor 1916-August-2.jpg|''The Weekly Monitor'' article on the start of construction of the [[Middleton Enginehouse]], followed by the new [[Windsor Enginehouse]] and [[Kentville Roundhouse]], August 23, 1916.
 +
 
 +
File:TO - 19160908 - TheLocomotiveHouse.jpg |''The Outlook'' article about the completion of the new [[Middleton Enginehouse]], Sept. 8. 1916.
 
</gallery>
 
</gallery>
  
Line 12: Line 14:
  
 
==External Links==
 
==External Links==
 +
The layout and structure of the Middleton Engine house appears, from photos of [[Windsor Enginehouse|its twin at Windsor]], to have followed the: [https://www.cptracks.ca/data/Structures/teeswater_39988.pdf the standard 1908 CPR plans also used for the three-stall engine house at Teeswater, Ontario featured on the Canadian Pacific Historical Association Documents Library]
 +
 +
Plans for visible smoke jack based on the : [https://www.cptracks.ca/data/Structures/H-15-103.pdf standard CPR 1915 plans featured on the Canadian Pacific Historical Association Documents Library]
 +
 +
[[Category:Roundhouses]]

Latest revision as of 21:28, 24 March 2023

Middleton Enginehouse September 1916 to 1927 [1]

An enginehouse at Middleton was built at the east end of the Middleton Railyard. The 88-foot long wooden engine house could accommodate three locomotives. Construction began in August 1916 by the DAR's Bridge and Building department, led by foreman H. Dalton. The enginehouse was completed around September 8, 1916. It was demolished in 1927, only lasting for ten years.

References

  1. Middleton 1909 -1984 Heart of the Valley pg. 26

External Links

The layout and structure of the Middleton Engine house appears, from photos of its twin at Windsor, to have followed the: the standard 1908 CPR plans also used for the three-stall engine house at Teeswater, Ontario featured on the Canadian Pacific Historical Association Documents Library

Plans for visible smoke jack based on the : standard CPR 1915 plans featured on the Canadian Pacific Historical Association Documents Library