Progress
Dave is in the planning stages of a two deck O Scale D.A.R. layout.
Planning Stage
Another screen shot of Kentville (below) and Middleton (above).
Grand Pre on the lower level with Windsor at the back. Digby Wharf and Stn on the upper back.
Kentville on the lower right, Wolfville on the lower left, Middleton on the uppper right and the Bear River bridge on the upper left.
Construction Begins
Kentville Yard benchwork emerges from the depths.
Temporary track has been laid....Sunset D10, SC&F minibox, plus two Intermountain boxcar kits, and trailing is a Mullet River van. Seems to look ok. Note that handlaid code 100 will be the norm.
CPR Van 435922, a Mullet River model. Lots of work, but they do turn out nice.
Tracklaying has commenced at the east end of Kentville Yard. The future station will be placed to the right of the boxcar.
January 2013 Update
Kentville Yard trackwork is almost complete.
Future site of the Kentville engine facilities
Showing Wolfville on the right. Almost every siding is included. Trackwork pierces the stairwell at the end.
Overall shot showing progress to date.
This category currently contains no pages or media.